OU-12/FGGM 17-Closed Sanitary Landfill

Document

 Date

Type

CSL Site Specific Addendum (2 copies)

Dec03

Report

CSL Groundwater Data Report (2 copies)

Jul03

Report

CSL Site Addendum Generic Field Sampling

Feb04

Report

CSL Site Addendum Generic Field Sampling

Aug03

Report

CSL Monitoring Plan & Requirements

6Nov08

Report

CSL Final-Groundwater Remedial Investigation (2copies)

Aug07

Report

Sanitary Landfill Study-Final Groundwater Data Base Report (2 copies)

Mar99

Report

Annual Detection & Assessment Monitoring Report CSL GW & Surface Water

Dec99

Report

CSL Cells 1 & 2 Methane Plume Investigation

Aug08

Report

CSL Quarterly Report IV Qtr, FY 2009

Oct09

CD

CSL Quarterly Report/2nd Qtr, FY 2010 (2)

Apr10

Report

CSL Mitigation System Task 5 System Upgrade Quarterly Report IV

Oct10

Report

Responses to USEPA, Remedial Investigation

18Nov05

Memo

2006 Annual Report CSL Groundwater Monitoring Program Dec 2006

12Apr07

Letter

Semiannual Report for the CSL

1Oct07

Letter

Semiannual Report for the CSL

1Nov07

Letter

CSL, Groundwater Remedial Investigation

21Apr08

Letter

Contamination of Lower Patapsco Formation Beneath CSL

16Jun08

Letter

Final Groundwater Remedial Investigation CSL

16Jun08

Letter

Conference Call Minutes Memo Sep 2008

25Sep08

Memo

MDE Monitoring Plan & Requirements Meeting Minutes 6Nov08 CSL

13Jan08

Letter

Regulatory Comments on Remedial Investigation Report

23Sep09

Email

Annual Detection & Assessment Monitoring Report CSL GW & Surface Water

Dec99

Letter

Call Summary to MDE CSL

4Mar10

Email

Multiple Site Response to Comments (Arcadis)

8Mar10

Letter

CSL Methane Mitigation System/Task 3 O&M Qtrly Report, 2nd Qtr Fiscal Yr 2010

13Apr10

Report

CSL Comments Re: Parameters, sampling locations dtd 20Apr

22Jun10

Letter

CSL Mitigation System Task 5 System Upgrade & Construction

Oct10

Report